Road Construction Contractors in Riverstone, NSW

What is included

What Is Included in Our Road Construction Contractors

  • We walk the route or site and check levels, existing services, drainage and where the ground is soft.
  • Topsoil and unsuitable material are stripped off and the ground is cut or filled to the shape of the road.
  • Where the job needs them, drainage pipes and pits are laid in trenches and backfilled in layers.
  • The subgrade is compacted and checked before any road base goes on it.
  • Crushed rock base is spread in layers, graded to a crossfall so water runs off, and compacted hard.
  • A bitumen seal or hot asphalt is laid on the finished base and rolled.
  • The new surface is joined to the existing road, and the edges are trimmed and finished.
  • We clear the site and go over the finished road with you.

Why us

Why Choose Us for Road Construction Contractors?

Accountable for every job, long after the day

Every road construction and roadworks job is done by the people who will still be here next year.

Tested and signed off before we leave

Everything we touch on your road construction and roadworks is tested before we go, you get walked through exactly what was done.

Local asphalt contractors, not a call centre

An asphalt contractor answers the phone and the same faces come back if the job runs over a day.

How the job runs

A road is built from the ground up

01

Telling us about the road

Tell us where the road is, who owns the land and what will use it, from cars to heavy trucks. Say whether it is a new road or an upgrade of an existing one. Work on a public road may need council or the road authority to approve it first, so we ask about that early.

02

Agreeing the scope on site

We look at the ground, the falls and the drainage, because they decide how deep the road base goes and where water leaves. Soft ground and buried services only show once digging starts. We agree what is built in each layer and where the work begins and ends.

03

Building the layers and handover

Work goes in order: earthworks, drainage, compacted base, then the sealed or asphalt surface. Each layer is compacted before the next one goes on. When the surface is down, we finish the edges and joins, clear the site and go over the road with you.

Common questions

Frequently Asked Questions

Which suburbs do you cover?

We work across Sydney and the surrounding suburbs, and the service areas page lists twenty-one of them, from Windsor and Richmond in the north-west to Liverpool and Narellan in the south-west. If yours is not listed it is still worth asking, because the list is where we work most often rather than a boundary.

What hours are you open?

We are open Monday to Friday, 8am to 5pm, and closed on Saturday and Sunday. Ring in those hours and tell us the suburb and what the surface is used for.

What is the difference between resurfacing and mill and fill?

Resurfacing lays new asphalt over the existing surface after it has been cleaned and repaired. Mill and fill first grinds off the top layer of old asphalt, then lays new asphalt in its place, which keeps the finished level the same and removes what has worn out.

How do I know if I need a patch or a full rebuild?

A surface that is only worn or lightly cracked can often be patched or resurfaced. Cracks in a network, soft spots that move under a foot, or water that keeps coming back usually mean the base under the surface has failed, and then the base has to be dug out and rebuilt.

How long before I can drive on new asphalt?

Asphalt has to cool before it takes traffic. How long that takes depends on how thick it is laid, the weather and the mix, so we tell you on the day when it is safe to use rather than giving a number here.

Can asphalt be laid in the rain?

No. Rain and a wet surface stop the new asphalt bonding to the layer under it, so a job planned for a wet day is moved to the next dry one.

What is spray sealing and when is it used?

Spray sealing sprays a layer of bitumen onto a prepared surface and covers it with stone chips that are rolled in. It is used on rural roads, long driveways and low-traffic roads where a full asphalt surface is more than the job needs.

Do you work on driveways as well as roads and car parks?

Yes. Asphalt driveways, car parks and roads are all on our service list, and so are the roadworks and civil work that sit underneath them.

Do I need council approval before the work starts?

Work on a public road or footpath usually needs permission from the road authority first. Work on private land can need council approval depending on the job. Describe the site when you call and we can tell you what to check.

What should I have ready when I call?

The suburb, roughly how big the area is in metres, what the surface is made of now, what it is used for and what is going wrong with it. That is enough to start a conversation about the job.

Do you do drainage as well as surfacing?

Yes. Stormwater drainage and retaining walls are on our service list, and they are often part of a surfacing job, because water that sits on or under a surface is what breaks it up.

What is asphalt profiling and road milling?

Profiling uses a milling machine to grind the top off an existing asphalt or concrete surface to a set depth and level. It removes a worn layer, corrects the shape of the road, or gets the surface ready for new asphalt.

Can old asphalt be recycled?

Yes. Old asphalt that has been milled or broken out can be crushed and used again as recycled road base, so it does not all have to go to landfill.

Do you build sports courts?

Sports court asphalting is on our service list. Tell us the type of court and the size of the area, and whether it is a new base or an existing court that needs resurfacing.

What does it cost?

The cost depends on the size of the area, how thick the surface is laid, the condition of the base under it and how easy the site is to reach. No two sites are the same, so we do not publish prices. Describe yours and we will talk through what drives it.

Ready when you are

Book Road Construction Contractors in Riverstone Today