Asphalt contractor in Parramatta, NSW
Working across Parramatta
Parramatta is a major commercial centre about 24 km west of the Sydney CBD, commonly regarded as its second CBD, on the Parramatta River. Parramatta Square is a civic precinct beside the Town Hall, light rail runs through the centre, and Sydney Metro West is under construction. Church Street is the main north-south route, and its southern stretch is known as Auto Alley for its car dealerships. So the paving is forecourts, car parks, lanes and busy streets, not quiet suburban cul-de-sacs.
A dense centre makes access the hard part. The Great Western Highway, Church Street and James Ruse Drive are major roads, so traffic control is likely, and the council or the road authority may need to be asked first. Several sites sit near heritage items, among them Lennox Bridge on Church Street, Prince Alfred Square and Old Government House in Parramatta Park, which can bring extra approvals. Building managers, strata and tenants hold the keys, and buried services are dense.
Summer maximums here often pass 35 degrees, the record is 47.0 degrees on 4 January 2020, and Parramatta can run 5 to 10 degrees hotter than the Sydney CBD on hot days. Heat softens asphalt, so ruts form where buses and trucks stop and turn. The centre is also described as the most flash-flood affected major CBD in NSW, so drainage and water on the surface matter as much as the asphalt itself.
What we do here most
What Parramatta keeps needing
A hot, busy and tightly built centre, where flash flooding is a known risk, wears surfaces fast and leaves little room for the work.
Car Park Resurfacing
Showroom car park and display yard
Car dealer yards combine customer parking, display areas and delivery trucks unloading transporters, all on the same surface. Wear shows at the entries and where the transporters stand. If the base is sound, resurfacing the worn zones can work. Trading days and how customers get in are planned around on site.
Asphalt Profiling & Road Milling
Milling a worn lane without raising kerb levels
In a built-up street, laying new asphalt straight over old can raise the road above the kerb and the pit lids. Milling takes the worn layer off first, so the new surface goes back to the same level. The edge is cut square with a saw before milling starts, so the neighbouring surface is not damaged.
Stormwater Drainage & Retaining Walls
Pits and pipes where water arrives fast
When rain runs off hard surfaces and arrives within hours, a blocked or undersized pit shows up quickly. Water stands on the asphalt, gets under the edges and breaks the surface from below. We would look at the falls, the pit and the pipe connection, and check what is buried before any digging starts.
Road repairs
Reinstating a trench cut across a street
Streets in a dense centre are often cut open to reach pipes and cables. Once the trench is closed, the asphalt over it settles and cracks along both edges. We cut back to a clean, square line, recompact the fill and lay new asphalt, which stops the patch breaking away at the joins.
If it is urgent
If a pothole opens up on a Parramatta street or in a car park
- 1Keep people and vehicles clear of the hole, and note its size, its depth and which lane or bay it is in.
- 2Do not fill it with loose soil, sand or rubble, because traffic and rainwater wash it back out.
- 3Tell us when you call whether it is on a council street, a state road or a private car park, and who the building manager or contact is.
Common questions
Frequently Asked Questions
Which suburbs do you cover?
We work across Sydney and the surrounding suburbs, and the service areas page lists twenty-one of them, from Windsor and Richmond in the north-west to Liverpool and Narellan in the south-west. If yours is not listed it is still worth asking, because the list is where we work most often rather than a boundary.
What hours are you open?
We are open Monday to Friday, 8am to 5pm, and closed on Saturday and Sunday. Ring in those hours and tell us the suburb and what the surface is used for.
What is the difference between resurfacing and mill and fill?
Resurfacing lays new asphalt over the existing surface after it has been cleaned and repaired. Mill and fill first grinds off the top layer of old asphalt, then lays new asphalt in its place, which keeps the finished level the same and removes what has worn out.
How do I know if I need a patch or a full rebuild?
A surface that is only worn or lightly cracked can often be patched or resurfaced. Cracks in a network, soft spots that move under a foot, or water that keeps coming back usually mean the base under the surface has failed, and then the base has to be dug out and rebuilt.
How long before I can drive on new asphalt?
Asphalt has to cool before it takes traffic. How long that takes depends on how thick it is laid, the weather and the mix, so we tell you on the day when it is safe to use rather than giving a number here.
Can asphalt be laid in the rain?
No. Rain and a wet surface stop the new asphalt bonding to the layer under it, so a job planned for a wet day is moved to the next dry one.
What is spray sealing and when is it used?
Spray sealing sprays a layer of bitumen onto a prepared surface and covers it with stone chips that are rolled in. It is used on rural roads, long driveways and low-traffic roads where a full asphalt surface is more than the job needs.
Do you work on driveways as well as roads and car parks?
Yes. Asphalt driveways, car parks and roads are all on our service list, and so are the roadworks and civil work that sit underneath them.
Do I need council approval before the work starts?
Work on a public road or footpath usually needs permission from the road authority first. Work on private land can need council approval depending on the job. Describe the site when you call and we can tell you what to check.
What should I have ready when I call?
The suburb, roughly how big the area is in metres, what the surface is made of now, what it is used for and what is going wrong with it. That is enough to start a conversation about the job.
Do you do drainage as well as surfacing?
Yes. Stormwater drainage and retaining walls are on our service list, and they are often part of a surfacing job, because water that sits on or under a surface is what breaks it up.
What is asphalt profiling and road milling?
Profiling uses a milling machine to grind the top off an existing asphalt or concrete surface to a set depth and level. It removes a worn layer, corrects the shape of the road, or gets the surface ready for new asphalt.
Can old asphalt be recycled?
Yes. Old asphalt that has been milled or broken out can be crushed and used again as recycled road base, so it does not all have to go to landfill.
Do you build sports courts?
Sports court asphalting is on our service list. Tell us the type of court and the size of the area, and whether it is a new base or an existing court that needs resurfacing.
What does it cost?
The cost depends on the size of the area, how thick the surface is laid, the condition of the base under it and how easy the site is to reach. No two sites are the same, so we do not publish prices. Describe yours and we will talk through what drives it.
Everything we do here
Services in Parramatta, NSW
These are the services that suit the hot, busy streets, car yards and fast-draining surfaces of Parramatta.
Also nearby
We work in these suburbs too
Local, and on the phone
Tell us about your Parramatta site
Tell us whether the surface is a council street, a state road or private land, and who manages the site. That decides who may need to be asked first and how a visit is planned. Type it in your message with the street name.
0468 075 505Monday to Friday 8am to 5pm, Saturday and Sunday closed
Not urgent? Send us the job instead