Asphalt contractor in Schofields, NSW
Working across Schofields
Schofields began as farmland and a railway siding on the Richmond line, and an airfield was built here in the Second World War. It now sits inside the NSW Government's North West Growth Area, with new housing developments underway and a village shopping centre near the station that was finished in mid-2021. Work here falls in new estate streets, around the shops and the station, and along the edge where paddocks are still becoming house lots.
Around the village centre and the station, car parks run on shopping hours and commuter traffic, so surface work is planned around when people park. In the estates, a street may still be held by a developer rather than council, and builders' vehicles share every road. Trucks reach the suburb by the M7 and the M2, but the last stretch is always a local street, so deliveries and traffic control are planned together. Services under the ground are located before we cut or dig, in old paddocks and new streets alike.
The land is flat. Before the war it was open farmland, and flat ground sheds water slowly, so falls and drainage have to be built into a pavement rather than assumed. Blacktown Council lists Schofields in the low-lying Eastern Creek catchment, where Hawkesbury-Nepean backwater is a high flood risk. A car park, driveway or street here is only as sound as the way its water leaves, and a thin base under a good surface still fails.
What we do here most
What Schofields keeps needing
Schofields is flat and growing, so each job comes back to where the water goes and what the new base will carry.
Asphalt Driveway Construction
A new driveway on a flat estate lot
A new house on a flat lot needs a driveway that falls away from the garage and the house wall. If the falls are wrong, water sits against the slab and the asphalt breaks at the low point. The base is compacted before the asphalt goes down, and the edge is cut square where it meets the kerb. Tell us the lot width and where the stormwater inlet sits.
Car Park Resurfacing
A commuter car park near the station
A car park beside a rail station fills early and stays full, with the same bays used every day. The surface wears at the entry, the turning lane and the bays nearest the platform. Resurfacing has to be staged so that part of the car park stays open. We would need to know how many bays can be closed at one time.
Stormwater Drainage & Retaining Walls
Ponding water on flat ground
On flat ground, a blocked pit or a pipe laid with too little fall leaves water lying on the surface. The water then softens the base and the asphalt breaks up around it. We would trace where the water comes from and where it can leave, and whether a new pit, a pipe or a regrade fixes it. The answer depends on levels we can only measure on site.
Road Base & Sub-Base Construction
A base under a street built over former paddock
A street built over paddock land starts with a base layer that has to be spread, watered and rolled in lifts. A base that is skipped or thin shows later as wheel-path rutting and cracked edges. Soft areas are found when the ground is stripped, not before. We would need to know what the street will carry, including construction traffic.
If it is urgent
If a pothole opens up on a Schofields street
- 1Keep people and vehicles clear of the hole, and note its size and whether water is lying in or near it.
- 2Do not fill it with loose soil, sand or gravel, because on flat ground the water that gets in simply washes it out again.
- 3When you call, tell us whether it is an estate street, a car park or a driveway, and whether the street has been handed over to council.
Common questions
Frequently Asked Questions
Which suburbs do you cover?
We work across Sydney and the surrounding suburbs, and the service areas page lists twenty-one of them, from Windsor and Richmond in the north-west to Liverpool and Narellan in the south-west. If yours is not listed it is still worth asking, because the list is where we work most often rather than a boundary.
What hours are you open?
We are open Monday to Friday, 8am to 5pm, and closed on Saturday and Sunday. Ring in those hours and tell us the suburb and what the surface is used for.
What is the difference between resurfacing and mill and fill?
Resurfacing lays new asphalt over the existing surface after it has been cleaned and repaired. Mill and fill first grinds off the top layer of old asphalt, then lays new asphalt in its place, which keeps the finished level the same and removes what has worn out.
How do I know if I need a patch or a full rebuild?
A surface that is only worn or lightly cracked can often be patched or resurfaced. Cracks in a network, soft spots that move under a foot, or water that keeps coming back usually mean the base under the surface has failed, and then the base has to be dug out and rebuilt.
How long before I can drive on new asphalt?
Asphalt has to cool before it takes traffic. How long that takes depends on how thick it is laid, the weather and the mix, so we tell you on the day when it is safe to use rather than giving a number here.
Can asphalt be laid in the rain?
No. Rain and a wet surface stop the new asphalt bonding to the layer under it, so a job planned for a wet day is moved to the next dry one.
What is spray sealing and when is it used?
Spray sealing sprays a layer of bitumen onto a prepared surface and covers it with stone chips that are rolled in. It is used on rural roads, long driveways and low-traffic roads where a full asphalt surface is more than the job needs.
Do you work on driveways as well as roads and car parks?
Yes. Asphalt driveways, car parks and roads are all on our service list, and so are the roadworks and civil work that sit underneath them.
Do I need council approval before the work starts?
Work on a public road or footpath usually needs permission from the road authority first. Work on private land can need council approval depending on the job. Describe the site when you call and we can tell you what to check.
What should I have ready when I call?
The suburb, roughly how big the area is in metres, what the surface is made of now, what it is used for and what is going wrong with it. That is enough to start a conversation about the job.
Do you do drainage as well as surfacing?
Yes. Stormwater drainage and retaining walls are on our service list, and they are often part of a surfacing job, because water that sits on or under a surface is what breaks it up.
What is asphalt profiling and road milling?
Profiling uses a milling machine to grind the top off an existing asphalt or concrete surface to a set depth and level. It removes a worn layer, corrects the shape of the road, or gets the surface ready for new asphalt.
Can old asphalt be recycled?
Yes. Old asphalt that has been milled or broken out can be crushed and used again as recycled road base, so it does not all have to go to landfill.
Do you build sports courts?
Sports court asphalting is on our service list. Tell us the type of court and the size of the area, and whether it is a new base or an existing court that needs resurfacing.
What does it cost?
The cost depends on the size of the area, how thick the surface is laid, the condition of the base under it and how easy the site is to reach. No two sites are the same, so we do not publish prices. Describe yours and we will talk through what drives it.
Everything we do here
Services in Schofields, NSW
These are the services we offer, and on Schofields' flat ground the drainage and base work often decides how a surface behaves.
Also nearby
We work in these suburbs too
Local, and on the phone
Tell us about your Schofields site
Tell us whether water lies on the surface after rain and where it sits. That tells us whether the problem is the surface, the base or the drainage, and how a visit should be planned. Please type it in, there is no need to send photos.
0468 075 505Monday to Friday 8am to 5pm, Saturday and Sunday closed
Not urgent? Send us the job instead