New Car Park Construction in Riverstone, NSW
What is included
What Is Included in Our New Car Park Construction
- We set out the car park with pegs and string and mark levels so water will fall toward the drains.
- Topsoil and soft ground are stripped off, and the area is dug down to the depth the pavement needs.
- The exposed ground is rolled and checked, and any soft spots are dug out and replaced with compacted fill.
- Crushed rock base is spread and compacted in layers, shaped to the falls the water needs to run off.
- Kerbs, edges and drainage pits are brought to finished height before any asphalt goes down, so it meets them cleanly.
- A thin spray of bitumen primer seals the rock base surface so the first asphalt layer sticks.
- Hot asphalt is laid by paving machine in even layers and rolled tight, with joins and edges worked by hand.
- The finished surface is swept clean and left ready for line marking and wheel stops.
Why us
Why Choose Us for New Car Park Construction?
Accountable for every job, long after the day
Every car park asphalting and construction job is done by the people who will still be here next year.
Tested and signed off before we leave
Everything we touch on your car park asphalting and construction is tested before we go, you get walked through exactly what was done.
Local asphalt contractors, not a call centre
An asphalt contractor answers the phone and the same faces come back if the job runs over a day.
How the job runs
Car parks are built from the ground up
The first call about a new car park
Tell us where the car park is going and roughly how big it needs to be. Tell us what will drive on it, from cars only to delivery trucks, and what the ground is now, whether grass, fill, clay or old paving. Those answers decide how deep the rock base has to be.
Agreeing levels and drainage on site
We walk the area and agree where the car park sits, where the water will run and where it leaves. Existing levels, trees, fences and drains all affect the layout. Council approval or plans may be needed first for a new car park, and we tell you if we think they will be.
Dig, build the base, lay asphalt
The ground is stripped and dug out, the rock base is spread and rolled in layers, and drains and kerbs are set to level. Only then does the asphalt go down, in even layers, rolled while hot. We clear up and hand the car park over ready for line marking.
Common questions
Frequently Asked Questions
Which suburbs do you cover?
We work across Sydney and the surrounding suburbs, and the service areas page lists twenty-one of them, from Windsor and Richmond in the north-west to Liverpool and Narellan in the south-west. If yours is not listed it is still worth asking, because the list is where we work most often rather than a boundary.
What hours are you open?
We are open Monday to Friday, 8am to 5pm, and closed on Saturday and Sunday. Ring in those hours and tell us the suburb and what the surface is used for.
What is the difference between resurfacing and mill and fill?
Resurfacing lays new asphalt over the existing surface after it has been cleaned and repaired. Mill and fill first grinds off the top layer of old asphalt, then lays new asphalt in its place, which keeps the finished level the same and removes what has worn out.
How do I know if I need a patch or a full rebuild?
A surface that is only worn or lightly cracked can often be patched or resurfaced. Cracks in a network, soft spots that move under a foot, or water that keeps coming back usually mean the base under the surface has failed, and then the base has to be dug out and rebuilt.
How long before I can drive on new asphalt?
Asphalt has to cool before it takes traffic. How long that takes depends on how thick it is laid, the weather and the mix, so we tell you on the day when it is safe to use rather than giving a number here.
Can asphalt be laid in the rain?
No. Rain and a wet surface stop the new asphalt bonding to the layer under it, so a job planned for a wet day is moved to the next dry one.
What is spray sealing and when is it used?
Spray sealing sprays a layer of bitumen onto a prepared surface and covers it with stone chips that are rolled in. It is used on rural roads, long driveways and low-traffic roads where a full asphalt surface is more than the job needs.
Do you work on driveways as well as roads and car parks?
Yes. Asphalt driveways, car parks and roads are all on our service list, and so are the roadworks and civil work that sit underneath them.
Do I need council approval before the work starts?
Work on a public road or footpath usually needs permission from the road authority first. Work on private land can need council approval depending on the job. Describe the site when you call and we can tell you what to check.
What should I have ready when I call?
The suburb, roughly how big the area is in metres, what the surface is made of now, what it is used for and what is going wrong with it. That is enough to start a conversation about the job.
Do you do drainage as well as surfacing?
Yes. Stormwater drainage and retaining walls are on our service list, and they are often part of a surfacing job, because water that sits on or under a surface is what breaks it up.
What is asphalt profiling and road milling?
Profiling uses a milling machine to grind the top off an existing asphalt or concrete surface to a set depth and level. It removes a worn layer, corrects the shape of the road, or gets the surface ready for new asphalt.
Can old asphalt be recycled?
Yes. Old asphalt that has been milled or broken out can be crushed and used again as recycled road base, so it does not all have to go to landfill.
Do you build sports courts?
Sports court asphalting is on our service list. Tell us the type of court and the size of the area, and whether it is a new base or an existing court that needs resurfacing.
What does it cost?
The cost depends on the size of the area, how thick the surface is laid, the condition of the base under it and how easy the site is to reach. No two sites are the same, so we do not publish prices. Describe yours and we will talk through what drives it.
Related work
Other jobs we get called out for
car park resurfacing
Car park resurfacing puts a fresh asphalt layer over a worn car park once the failed areas are repaired, and is carried out across Sydney and its western, north-western and surrounding suburbs.
Read morespray sealing and bitumen sealing
Spray sealing is a coat of bitumen sprayed onto a road or driveway and covered with stone chip, carried out across Sydney and its western, north-western and surrounding suburbs.
Read moreasphalt driveway construction
Asphalt driveway construction is building a new driveway on a compacted rock base and surfacing it with hot asphalt, carried out across Sydney and its western, north-western and surrounding suburbs.
Read moreServing Riverstone and The Surrounding Areas
Where we work
Ready when you are
Book New Car Park Construction in Riverstone Today
Tell us what the car park will be used for, for example staff cars only or delivery trucks as well. It is the first thing that decides how thick the base and the asphalt need to be.
0468 075 505Monday to Friday 8am to 5pm, Saturday and Sunday closed
Not urgent? Send us the job instead
