New Asphalt Layer for Car Parks in Riverstone, NSW

What is included

What Is Included in Our New Asphalt Layer for Car Parks

  • We sweep the car park clean so dirt, oil and loose stone are not trapped under the new surface.
  • Failed patches, potholes and soft areas are cut out and rebuilt first, because new asphalt cannot hide a weak base.
  • Cracks are cleaned out and filled with sealant so they are less likely to show through the new surface.
  • We check heights at kerbs, drains, pits and doorways so the new layer leaves no step or puddle.
  • Where the new layer would sit too high, the old surface is milled down first so the finished level matches.
  • A tack coat of bitumen emulsion is sprayed across the clean surface so the new asphalt bonds to it.
  • Hot asphalt is laid in strips by paving machine, rolled while hot, and joined to edges and pits by hand.
  • The edges are cleaned and swept, and traffic stays off the new asphalt until we say it can take it.

Why us

Why Choose Us for New Asphalt Layer for Car Parks?

Accountable for every job, long after the day

Every car park resurfacing job is done by the people who will still be here next year.

Tested and signed off before we leave

Everything we touch on your car park resurfacing is tested before we go, you get walked through exactly what was done.

Local asphalt contractors, not a call centre

An asphalt contractor answers the phone and the same faces come back if the job runs over a day.

How the job runs

Resurfacing is mostly about getting levels right

01

The first call about the surface

Tell us how big the car park is and what is wrong with it, such as worn stone, cracking, patches or ponding. Tell us whether it has to stay open for customers or staff. We will ask what is around the edges, like kerbs, pits and doorways, because they limit how much height a new layer can add.

02

Agreeing what gets repaired first

We walk the car park and decide, area by area, what can simply be overlaid and what must be cut out and rebuilt first. Where levels are tight at kerbs or doors, the old surface may be milled down. Some weak patches only show once the surface is lifted, and we say so up front.

03

Sweep, tack coat, lay and roll

On the day the surface is swept, the repairs are finished and the tack coat is sprayed. The new asphalt goes down in strips and is rolled while hot, with joins and edges finished by hand. We mark off the fresh surface and show you where traffic can and cannot go.

Common questions

Frequently Asked Questions

Which suburbs do you cover?

We work across Sydney and the surrounding suburbs, and the service areas page lists twenty-one of them, from Windsor and Richmond in the north-west to Liverpool and Narellan in the south-west. If yours is not listed it is still worth asking, because the list is where we work most often rather than a boundary.

What hours are you open?

We are open Monday to Friday, 8am to 5pm, and closed on Saturday and Sunday. Ring in those hours and tell us the suburb and what the surface is used for.

What is the difference between resurfacing and mill and fill?

Resurfacing lays new asphalt over the existing surface after it has been cleaned and repaired. Mill and fill first grinds off the top layer of old asphalt, then lays new asphalt in its place, which keeps the finished level the same and removes what has worn out.

How do I know if I need a patch or a full rebuild?

A surface that is only worn or lightly cracked can often be patched or resurfaced. Cracks in a network, soft spots that move under a foot, or water that keeps coming back usually mean the base under the surface has failed, and then the base has to be dug out and rebuilt.

How long before I can drive on new asphalt?

Asphalt has to cool before it takes traffic. How long that takes depends on how thick it is laid, the weather and the mix, so we tell you on the day when it is safe to use rather than giving a number here.

Can asphalt be laid in the rain?

No. Rain and a wet surface stop the new asphalt bonding to the layer under it, so a job planned for a wet day is moved to the next dry one.

What is spray sealing and when is it used?

Spray sealing sprays a layer of bitumen onto a prepared surface and covers it with stone chips that are rolled in. It is used on rural roads, long driveways and low-traffic roads where a full asphalt surface is more than the job needs.

Do you work on driveways as well as roads and car parks?

Yes. Asphalt driveways, car parks and roads are all on our service list, and so are the roadworks and civil work that sit underneath them.

Do I need council approval before the work starts?

Work on a public road or footpath usually needs permission from the road authority first. Work on private land can need council approval depending on the job. Describe the site when you call and we can tell you what to check.

What should I have ready when I call?

The suburb, roughly how big the area is in metres, what the surface is made of now, what it is used for and what is going wrong with it. That is enough to start a conversation about the job.

Do you do drainage as well as surfacing?

Yes. Stormwater drainage and retaining walls are on our service list, and they are often part of a surfacing job, because water that sits on or under a surface is what breaks it up.

What is asphalt profiling and road milling?

Profiling uses a milling machine to grind the top off an existing asphalt or concrete surface to a set depth and level. It removes a worn layer, corrects the shape of the road, or gets the surface ready for new asphalt.

Can old asphalt be recycled?

Yes. Old asphalt that has been milled or broken out can be crushed and used again as recycled road base, so it does not all have to go to landfill.

Do you build sports courts?

Sports court asphalting is on our service list. Tell us the type of court and the size of the area, and whether it is a new base or an existing court that needs resurfacing.

What does it cost?

The cost depends on the size of the area, how thick the surface is laid, the condition of the base under it and how easy the site is to reach. No two sites are the same, so we do not publish prices. Describe yours and we will talk through what drives it.

Ready when you are

Book New Asphalt Layer for Car Parks in Riverstone Today