Asphalt contractor in Box Hill, NSW

Working across Box Hill

Box Hill is in the Hills District, bounded by Boundary Road, Annangrove Road, Old Pitt Town Road and Windsor Road. It was rezoned in 2013 and is still filling: the 2021 census counted 6,450 residents, a long way short of what the planning expects. The plan sets aside 133 hectares of employment land as well as housing, so the work here is new estate roads and driveways now, and larger commercial hardstand as the employment land is built.

The Hills Shire Council manages the growth area, and Windsor Road is a main road that may need the road authority's approval for any work near it. A street that is still under construction may belong to the developer. Older buildings sit among the new ones, including a heritage-listed inn on Windsor Road and a heritage-listed house on Terry Road, so council may need to be asked about work close to them. Planning here moved Mt Carmel Road to limit damage to the creek and native trees, so space beside roads can be tight.

The precinct has creek corridors and protected vegetation that the roads are planned around, and council's plan for the area includes water management works for the Second Ponds Creek catchment. That makes drainage part of the road rather than an extra. Streets that are not yet finished carry builders' trucks on a base meant for final traffic, and the first sign is usually broken edges and rutted wheel paths, long before the surface is old.

What we do here most

What Box Hill keeps needing

Box Hill is a growth area part way through being built, so the jobs follow the building: roads first, then drainage, then the damage that construction traffic leaves.

Subdivision Road Construction

A new road routed around a creek corridor

A road planned beside a creek and protected trees leaves little room to work. The corridor sets how wide the formation can be, where the pipes cross, and where the water goes. We would need the approved road plan and the stage you are working to. Excavation, base and asphalt are done in order, with the pipes in before the base.

Stormwater Drainage & Retaining Walls

Drainage on a street that drains to a creek

A new street that drains towards a creek needs pits, pipes and an outlet that does not scour the bank. Without them, runoff cuts the edge of the road and silt ends up in the creek. We would look at the fall of the street and where the outlet meets the corridor. Which approvals are needed depends on the creek and the council.

Commercial Asphalting

A hardstand on new employment land

Employment land is flat, open ground that becomes a yard, a car park or a loading area. Trucks need a surface and base that suit how often they come and how they turn. A thin build saves effort at first and shows ruts under heavy use. We would want to know the vehicles, the loads and the layout.

Road repairs

Broken edges on an unfinished estate street

Streets in a growth area often carry builders' trucks before they have their final surface. The edges break, the wheel paths rut and water gets into the base. A repair done too early is run over again by the same trucks. We would look at whether the street is still under construction and when the final surface is due.

If it is urgent

If a pothole opens up on a Box Hill road

  1. 1Keep people and vehicles clear of the hole, and note its size and where it is on the road.
  2. 2Do not fill it with loose soil, sand or gravel, because heavy trucks will pull it out and scatter it along the street.
  3. 3When you call, tell us the street name, whether the road is finished or still in construction, and whether it is a main road such as Windsor Road or a local street.
Call 0468 075 505

Common questions

Frequently Asked Questions

Which suburbs do you cover?

We work across Sydney and the surrounding suburbs, and the service areas page lists twenty-one of them, from Windsor and Richmond in the north-west to Liverpool and Narellan in the south-west. If yours is not listed it is still worth asking, because the list is where we work most often rather than a boundary.

What hours are you open?

We are open Monday to Friday, 8am to 5pm, and closed on Saturday and Sunday. Ring in those hours and tell us the suburb and what the surface is used for.

What is the difference between resurfacing and mill and fill?

Resurfacing lays new asphalt over the existing surface after it has been cleaned and repaired. Mill and fill first grinds off the top layer of old asphalt, then lays new asphalt in its place, which keeps the finished level the same and removes what has worn out.

How do I know if I need a patch or a full rebuild?

A surface that is only worn or lightly cracked can often be patched or resurfaced. Cracks in a network, soft spots that move under a foot, or water that keeps coming back usually mean the base under the surface has failed, and then the base has to be dug out and rebuilt.

How long before I can drive on new asphalt?

Asphalt has to cool before it takes traffic. How long that takes depends on how thick it is laid, the weather and the mix, so we tell you on the day when it is safe to use rather than giving a number here.

Can asphalt be laid in the rain?

No. Rain and a wet surface stop the new asphalt bonding to the layer under it, so a job planned for a wet day is moved to the next dry one.

What is spray sealing and when is it used?

Spray sealing sprays a layer of bitumen onto a prepared surface and covers it with stone chips that are rolled in. It is used on rural roads, long driveways and low-traffic roads where a full asphalt surface is more than the job needs.

Do you work on driveways as well as roads and car parks?

Yes. Asphalt driveways, car parks and roads are all on our service list, and so are the roadworks and civil work that sit underneath them.

Do I need council approval before the work starts?

Work on a public road or footpath usually needs permission from the road authority first. Work on private land can need council approval depending on the job. Describe the site when you call and we can tell you what to check.

What should I have ready when I call?

The suburb, roughly how big the area is in metres, what the surface is made of now, what it is used for and what is going wrong with it. That is enough to start a conversation about the job.

Do you do drainage as well as surfacing?

Yes. Stormwater drainage and retaining walls are on our service list, and they are often part of a surfacing job, because water that sits on or under a surface is what breaks it up.

What is asphalt profiling and road milling?

Profiling uses a milling machine to grind the top off an existing asphalt or concrete surface to a set depth and level. It removes a worn layer, corrects the shape of the road, or gets the surface ready for new asphalt.

Can old asphalt be recycled?

Yes. Old asphalt that has been milled or broken out can be crushed and used again as recycled road base, so it does not all have to go to landfill.

Do you build sports courts?

Sports court asphalting is on our service list. Tell us the type of court and the size of the area, and whether it is a new base or an existing court that needs resurfacing.

What does it cost?

The cost depends on the size of the area, how thick the surface is laid, the condition of the base under it and how easy the site is to reach. No two sites are the same, so we do not publish prices. Describe yours and we will talk through what drives it.

Local, and on the phone

Tell us about your Box Hill site

Tell us whether the road or yard is finished, still under construction or already handed to council. That decides who we need to speak to and how a visit is planned. Please type it in, there is no need to send photos.

0468 075 505

Monday to Friday 8am to 5pm, Saturday and Sunday closed

Not urgent? Send us the job instead